Halton School Addition Exterior
School Hall with Lockers Location: Halton, Ontario
Square Footage: 16,175
Number of Modules: 30 + 2 Roof Modules
Completion Date: From start of production to completion on site, 10 weeks
As a complete design/build project, NRB was responsible for all design and construction elements of the addition, plus modifications to the existing school building. These included two roof modules with a prepoured concrete slab, which allowed continuity of the fire exit.
The prefabricated school buildings feature steel and concrete, non-combustible construction, with varying sized modules created to fit precisely into the corner of the existing school. The modular addition connects seamlessly into the adjacent school at floor level in one area, with steps up to the existing school in the other area, because the grade drops significantly over the 156-feet length.
Although permanent by intent, the building modules were designed so that the five smaller units along the 156' length are removable to stand alone or to work as a smaller complex, should enrollment eventually shift.
Another quality facility built by NRB Inc.